10 exam-style questions with answers and explanations, straight from our 1,030-question bank. Tap an answer to check yourself. When you're ready, take the scored version in the free practice test.
These 10 free CPEA questions are organized by exam domain, so you can see how each part of the Certified Professional EHS Auditor blueprint is tested. Reveal the answer and explanation under each question.
Domain 1: Ethics 4% of exam
Question 1
A draft finding states that a required environmental report was filed late. Before release, the auditor authenticates an extension issued by the permitting authority before the original deadline and confirms that the report was filed before the extended deadline. The extension was valid under the permit. The audit sponsor asks to retain the finding because it would strengthen the company's position in negotiations with the site operator. What should the auditor do with the finding?
Show answer & explanation
Correct answer: A - Withdraw it and retain the evidence supporting the revised conclusion.
Domain 2: Due Professional Care 13% of exam
Question 2
An EHS assurance engagement follows the IIA Global Internal Audit Standards (2024). The proposed auditor managed the site's wastewater program until eight months ago. Standard 2.2 presumes impaired objectivity when an auditor assesses an activity they were responsible for within the preceding 12 months. An equally qualified auditor with no prior responsibility for the program is available. How should the wastewater work be assigned?
Show answer & explanation
Correct answer: D - Assign the independent auditor to assess the program; use the former manager only as a factual resource.
Question 3
An experienced lead auditor can evaluate audit evidence but lacks the specialized knowledge needed to assess an emissions calculation in the agreed scope. An independent emissions specialist is available, and the lead has confirmed the specialist's technical competence. The specialist has not led an audit. Which division of responsibility would allow the engagement to proceed appropriately?
Show answer & explanation
Correct answer: A - The specialist evaluates the technical calculation; the lead integrates that work into the audit conclusion.
Domain 3: Program Implementation 19% of exam
Question 4
A corporate audit program can advance one site visit this quarter. There are no mandatory audit deadlines or immediate uncontrolled hazards. East has commissioned a bulk-solvent transfer system and introduced night-shift contractors; neither change has been audited. North has recurring document-number errors, with the affected controls otherwise verified as effective. South is an unchanged, low-hazard warehouse with the longest interval since its last audit. West has the largest workforce but no significant operational changes. Which allocation has the strongest risk basis?
Show answer & explanation
Correct answer: A - East, to evaluate controls affected by the new process and contractor arrangements.
Question 5
A quarterly dashboard measures actions due in that quarter that were closed by their original due dates. Closure requires independent verification of effectiveness. Of 20 actions due, 10 passed that verification by their deadlines, four were implemented on time but verified after their deadlines, two were implemented and verified late, and four remain open. Another six actions due next quarter were closed early this quarter. Which dashboard result uses the specified measure correctly?
Show answer & explanation
Correct answer: C - 50%, because only ten of the twenty actions due passed independent effectiveness verification by their original deadlines.
Domain 4: Audit Execution 45% of exam
Question 6
A discharge permit sets a daily maximum of 1.0 mg/L for a metal. Every result in the month is reported as 'not detected,' but the laboratory's reporting limit is 5.0 mg/L. The laboratory confirms that these results cannot distinguish concentrations below 1.0 mg/L from concentrations between 1.0 and 5.0 mg/L. What do the results establish?
Show answer & explanation
Correct answer: B - Neither compliance nor an exceedance; the analytical evidence cannot resolve the permit limit.
Question 7
A complete quarterly inspection file repeats three records in this order: day shift, evening shift, night shift. The auditor selects every third record after a random start among the first three. What is the principal coverage defect in this plan?
Show answer & explanation
Correct answer: B - The interval matches the shift cycle, leaving two shifts outside the selected sample.
Question 8
During an audit at a U.S. general-industry facility, a worker is about to enter a permit-required tank. The permit prohibits entry below 19.5% oxygen. A functioning, correctly calibrated monitor now reads 18.2%, although the permit recorded 20.8% thirty minutes earlier. The site's stop-work procedure authorizes any person to halt an unsafe entry and notify the entry supervisor. The auditor has no entry-supervisor or rescue role. Which response is required now?
Show answer & explanation
Correct answer: D - Halt the entry and alert the entry supervisor from outside the tank.
Question 9
A wastewater sample contains a solvent. The same solvent appears in an equipment blank prepared by passing clean water through the reusable sampler immediately after cleaning and before collecting the wastewater. A field blank exposed to the sampling environment, an unopened trip blank, and a laboratory method blank show no detectable solvent at comparable reporting limits. Which potential source of contamination should be investigated first?
Show answer & explanation
Correct answer: B - Residual solvent left in the sampler, indicating that equipment cleaning may have been ineffective.
Domain 5: Audit Reporting 17% of exam
Question 10
At Outfall 2, the permit's daily maximum for a pollutant is 10 mg/L; an adopted corporate standard sets a daily maximum of 8 mg/L. Both are applicable audit criteria. A valid daily result is 9.1 mg/L. The finding should identify:
Show answer & explanation
Correct answer: C - A corporate-standard nonconformity, with no exceedance of the permit's daily maximum.